purpose
In the neighborhood, there is a piece of land that is not being used. The residents would like to have a basketball court since they are not allowed to park or use this land for any activities. Therefore, the HOA decided to explore utilizing the empty land for a basketball court.
BACKGROUND AND EXISTING CONDITIONS
The land is located by I-17 interstate and has a sub-basin that is approximately 1/3 of the total area. Also, a part of I-17 drainage discharge flows into the existing sub-basin. Therefore, there are two barrel circular culverts to convey this water out of the land and into the ponderosa trail drainage system. Moreover, there are some trees on the land that might be in the way of the proposed location of the basketball court. There is no parking spots by the land. The land is between two houses and it faces the street.
SCOPE OF SERVICES
The tasks below are the work process that the team will be preforming for the client in regard of designing the basketball court.
Task 1: Project management
Task 2: Data Collection
Task 3: Surveying
Task 4: Drainage
Task 5: Additional Features
Task 6: Final Dsign
LOCATION
SCHEDULE
Initial Projct Time Line
Final Poject Time Line
Contact Info
Project Manager: Hamad Alqalaf
E-mail: ha228@nau.edu